ASTM D3276 07 PDF

Designation: D – 07Standard Guide for Painting Inspectors (Metal Substrates)1 This. Buy ASTM D GUIDE FOR PAINTING INSPECTORS (METAL SUBSTRATES) from SAI Global. ASTM D – Designation: D – 00 Standard Guide for Painting Inspectors (Metal Substrates.

Author: Dom Shakabar
Country: Central African Republic
Language: English (Spanish)
Genre: Video
Published (Last): 10 April 2013
Pages: 493
PDF File Size: 9.11 Mb
ePub File Size: 20.61 Mb
ISBN: 835-1-47523-787-1
Downloads: 84276
Price: Free* [*Free Regsitration Required]
Uploader: Yozshunris

A superscript epsilon e indicates an editorial change since the last revision or reapproval. Surfaces that have been dry blasted should be brushed with clean brushes, blown with compressed air free of oil and moisture, or vacuum cleaned to eliminate any traces of blast products, dust, or dirt from the surface.

For large jobs it is recommended that before work starts, an actual steel sample of adequate size be blasted to the satisfaction of the project engineer. Recoat V3276 observed It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.

Environmental conditions must be within speci?

Compressed air check 4. Comparison of Surface Preparation. Coating Storage and Handling. Contaminated cloths should not be dipped into clean solvent. One kind of cutting device is described in The calibration should be made on metal of the same kind, temper, thickness, and contour as that beneath the coating.

  ALAN FOUST PRINCIPIOS OPERACIONES UNITARIAS PDF

Insofar as practicable, the steel should be stored to avoid the formation of waterholding pockets.

Many materials if not removed from the surface will affect the life of the coating. Link to Active This link will always route to the current Active version of the standard. Correct coating and mixing procedure 9. Clean and dry abrasive 3. Any solvents left in the equipment should be completely removed before applying coating to the surface being painted.

Sstm view current version of standard. The technique is from dry to wet, with the coating applied to the surface and spread back to the wet edge of the previous strokes.

The values given in parentheses are for information only. Preparation for Inspection 4.

ASTM D – 07 Standard Guide for Painting Inspectors (Metal Substrates)

Hand tool cleaning in accordance with 5. D276 inspector should keep a record of all paint modi? High voltage holiday testing is suitable for coating systems greater than ? High-pressure water blasting is often used to remove these contaminants.

The items should be selected that are pertinent to the specification of a particular job.

Standards monitoring is a free service designed for you who wish to be adtm of changes to or new editions of the standards required in your work. NOTE 1—For additional helpful information, refer to the following documents: There are two ways of making the measurements, nondestructively or destructively.

Wet surfaces should not be painted unless the coatings are 007 Commercial Grade Power Tool Cleaning. Condition of edges, weld splatter 2.

  COMMENT INSTALLER UN PARATONNERRE PDF

NOK 1 ,00 excl.

ASTM D3276:15

It is very important to record and retain test results. The strainers should be of a type to remove only skins, etc.

Note 1 – For additional helpful information, refer to the following documents: It is also useful at this point to mix or pour repeatedly from one container to another boxing until the composition is uniform. Some coatings are considered dry for recoating when the next coat can be applied without the development of any wstm

Occupational Health and Safety Administration regulations should be followed. It is important to note that the painting inspector check all areas and determine the?

Test Methods D describe the procedure for using magnetic gages. The bottom of the original container should be inspected for the unmixed pigment. The required thinner is then added and the two portions are remixed to obtain a homogenous mixture. Material Safety Data Sheets needed to ensure that personnel take necessary precautions in handling hazardous materials.

Time from surface preparation to application 2. On lead removal projects, inspectors should be ashm with OSHA requirements for their own health and safety.